SACRAMENTO – The Office of Energy Infrastructure Safety (Energy Safety) today adopted its 2025 Wildfire Mitigation Plan (WMP) Electrical Corporation Maturity Model and Survey Guidelines. Adoption of the guidelines, during a public meeting, followed a 30-day public comment period.
California’s electrical corporations, as part of their WMPs, are required to follow the guidelines to assess their ability to reduce wildfire risk and the relative maturity of their wildfire mitigation programs. The survey is a questionnaire about the specifics of their WMP submissions. It is used to help assess wildfire mitigation maturity over time.