SACRAMENTO – The Office of Energy Infrastructure Safety (Energy Safety) today released its Draft 2026-2028 Wildfire Mitigation Plan (WMP) Guidelines for public comment. Release of the draft guidelines initiates a 30-day public review and comment period.
Written comments are due by December 12 and must be submitted to the 2026 to 2028 Electrical Corporation Wildfire Mitigation Plans docket (#2026-2028-WMPs) in Energy Safety’s e-filing system. The proposed guidelines will be considered for adoption at a public meeting in December.
Energy Safety promulgates guidelines that the electrical corporations must follow in the development of their three-year base WMPs, annual WMP Updates and during their annual WMP compliance period.