Wildfire Mitigation Plan Performance Assessment
Energy Safety’s Performance Assessment Division is responsible for oversight of electrical corporation performance of mitigation activities and strategies in the wildfire mitigation plans (WMP). In accordance with Government Code §15475.21(b), Energy Safety also identifies issues that the electrical corporations must expeditiously resolve to minimize wildfire risk and resolve nonperformance with WMP initiatives to support public safety.
Annual Performance Reports (Formerly Annual Reports on Compliance)
To assess and evaluate electrical corporations’ performance of their WMPs, Energy Safety prepares annual performance reports (formerly known as Annual Reports on Compliance). Historic annual reports appear below.
Energy Safety’s 2023 Annual Reports on Compliance
- SCE – 9/24/25
- Bear Valley Electric Service – 8/20/25
- PacifiCorp – 8/15/25
- LS Power – 8/12/25
- Trans Bay Cable – 8/12/25
- PG&E – 7/25/25
- Liberty – 7/21/25
- Horizon West Transmission – 7/18/25
- SDG&E – 6/25/25
Energy Safety’s 2022 Annual Reports on Compliance
- PG&E – 2/14/25
- Bear Valley Electrical Service– 2/14/25
- Trans Bay Cable – 12/12/24
- Liberty – 11/8/24
- SCE – 10/21/24
- PacifiCorp – 10/1/24
- SDG&E – 9/26/24
- Horizon West Transmission – 9/24/24
Energy Safety’s 2021 Annual Reports on Compliance
- PG&E – 9/5/24
- Horizon West Transmission – 6/25/24
- Liberty Utilities – 6/21/24
- PacifiCorp – 6/21/24
- Trans Bay Cable – 6/6/24
- BVES – 4/23/24
- SCE – 4/3/24
- SDG&E – 3/19/24
Energy Safety’s 2020 Annual Reports on Compliance:
- PG&E – 2/24/23
- PacifiCorp – 2/24/23
- San Diego Gas & Electric – 1/10/23
- Bear Valley Electrical Service – 12/27/22
- Liberty Utilities – 12/27/22
- Horizon West Transmission – 12/13/22
- Southern California Edison– 12/13/22
- Trans Bay Cable – 12/13/22
Electrical Corporation Annual Reports on Compliance include:
- Electrical Corporation Annual Reports on Compliance (EC ARC) required pursuant to Public Utilities Code §8386.3(c)(1)
- Notices of substantial vegetation management (SVM) completion required pursuant to Public Utilities Code §8386.3(c)(5)(A)
WMP Compliance Process
Public Utilities Code §8389(d)(3) directs the CPUC, after consultation with Energy Safety, to “adopt and approve” a “wildfire mitigation plan compliance process” by December 1 annually. The CPUC formally reviews, adopts, and approves Energy Safety’s WMP Compliance Process documents via resolution.
2024 WMP Compliance Process – Adopted via CPUC Resolution SPD-27
2023 WMP Compliance Process – Adopted via CPUC Resolution SPD-13
2022 WMP Compliance Process – Adopted via CPUC Resolution SPD-7
2021 WMP Compliance Process – Adopted via CPUC Resolution M-4860
2020 WMP Compliance Process – Adopted via CPUC Resolution WSD-012
Performance Guidelines (Formerly Compliance Guidelines)
The Office of Energy Infrastructure Safety (Energy Safety) has authority under Government Code section 15475.6 to “adopt guidelines setting forth the requirements, format, timing, and any other matters required to exercise its powers, perform its duties, and meet its responsibilities described in Sections 326, 326.1, and 326.2 and Chapter 6 (commencing with Section 8385) of Division 4.1 of the Public Utilities Code….”
Pursuant to Public Utilities Code section 8386(b), electrical corporations must annually prepare and submit a Wildfire Mitigation Plan (WMP) to Energy Safety for review and approval. Subsequently, pursuant to section 8386.3(c), Energy Safety is charged with assessing the electrical corporations’ WMP initiative performance. Energy Safety’s Performance Guidelines set forth substantive and procedural requirements for electrical corporations both during and after the annual assessment period.